Tootgarook: Alma St and Field St Footpath Construction Stage 2
- Project typeRoads, Streetscapes and Footpaths
- Project value$928,000 (Stage 2)
The Pedestrian Access Strategy identified the necessity of constructing a footpath along Alma Street and Field Street to establish a significant east-west connection within the pedestrian network of Rye and Tootgarook.
The proposed works encompassed the construction of a 2m wide concrete path, along with the necessary infrastructure such as kerbs and pedestrian refuge islands along the designated route.
Due to budget constraints, the project was divided into two stages. Stage 1 was successfully completed in 2022. Stage 2 works from Marshall Street to Truemans Road were completed in October 2024.
Update: December 2024