Mornington: Civic Reserve Sports Pavilion Project

  • Project typeBuildings
  • Project value$6,312,000
Civic-Reserve-Sports-Pavilion-Roof-Install.png

As a result of the redevelopment of Civic Reserve sporting fields and athletics track a pavilion is required to service the new facilities.

  • Energy efficiency has been prioritised in the design. A large 50kW solar PV system, passive design elements and efficient hot water, heating and cooling equipment will help to lower energy bills for the clubs, as well as reduce greenhouse gas emissions by almost 90% over the lifetime of the building. In addition, water sensitive urban design (WSUD) elements will help detain and treat stormwater to reduce pollutants and ease flood risks downstream.

This project will be combined with the broader precinct landscaping design that includes a perimeter walkway, outdoor gymnasium and will also resolve water retention issues on the eastern side of the athletics & soccer pitches.

The project will be delivered in the following phases:

  • Phase 1 - Construction of Sports Pavilion and surrounding civil and landscaping works (Feb 2022 – June 2023)
  • Phase 3 - Perimeter Tree planting. (May 2023 – June 2023). 
  • Phase 2 - Perimeter track and drainage work (April 2023 – May 2023)

 

Drainage works have commenced and are nearing completion. Foundation works are completed, and structural steel and blockwork has commenced on site. It is anticipated the project will reach Practical Completion by end of June 2023 subject to weather conditions.

 

Updated: May 2023