Mount Eliza: Baden Powell Drive Footpath Stage 1 (Design only)

  • Project typeRoads, Streetscapes and Footpaths
  • Project value$130,000. (Design only)

A footpath along Baden Powell Drive is included in the Shire’s Pedestrian Access Strategy. The purpose of this footpath is to provide a link for pedestrians between Baden Powell Drive to the Mount Eliza township.

The project is proposed to be undertaken in two stages.

  • Stage 1 includes a footpath along the northern side of Baden Powell Drive from Humphries Road to near 122 Baden Powell Drive.
  • Stage 2 involves extending this path via Baden Powell Drive and Nepean Highway to the existing footpath network on Canadian Bay Road, providing a pedestrian link to the Mount Eliza township.

Detailed Design Tender Issue drawings for Stage 1 have been received. A complex Cultural Heritage Management Plan (CHMP) will be required prior to construction works. Both construction for Stage one and the detailed design for Stage two are subject to funding in future financial years. This project was not funded in the recent budget process.  

 

 

 

 

Update: July 2025

Location

Baden Powell Drive, Mount Eliza 3930  View Map

Google Map